Hi BJ,
Wow, that's a long post. I'm going to have to post on top this time so you can see it ;-)
Anyways, grounding of ScTP cables is a big issue that DOES NOT have a resolution yet. This is because the solution would exist on the intersection of at least two building construction disciplines - electrical power and information transport systems (OK - the last one is just old structured cabling - I've been reading too much BISCI stuff lately ;-)) As such, there will always be two approaches from different angles - safety on one hand and performance on the other. And don't forget the cost of implementation, too. It has always been exorbitant for ScTP considering labor and such.
Bottom line is: in order for the shield to be effective it needs to be grounded on both ends. It creates a need for the point of ground at the work area outlet. Unless you are willing to extend your telecom grounding to EACH outlet, you are stuck using the equipment's power ground that actually belongs to the whole different grounding system and is only connected to the telecom at the grounding rod. Or it could even be connected to another grounding rod! That wholly depends on the building and you are always at the mercy of other people.
Anyways, long story and I gotta go right now. So, I thought the best way to address this would be to release in the open one of our paid e-books, Guide to Separation of Network Cabling from EMI Sources. This document is circa 2000 but not too much has changed since. Check in couple days this page of our site:
Cheers,
Dmitriy Abaimov, RCDD