In 1957 and 1958, after graduating from Kenmore High School, near
> Buffalo, I was a turbine operator at Niagara Mohawk's Charles R. Huntley
> Steam station in Tonawanda, on the Niagara River. We were still
> operating units 25 hz 24, 25 and 26 and a reversable frequency changer.
> Total cap. was abt. 200 MW, alongside 1000 MW of 60 Hz power in the
> newer sections of the plant. Operation varied with the business
> climate, from full bore 24/7 to daily startup/ shutdown, occasionally
> with only one unit. Interesting work ... I got to do the throttle ups
> and enjoy the synchrozation process during startup. It could get
> dicey with our 30-50 year old equipment and synchroscope like a giant
> clock up on the wall. Equally exciting were sudden power dumps as
> happened during severe weather. Big building quake, followed by opening
> of steam safety valves atop the adjoining boiler house.
Who bought this 25Hz power?