For the most part no one had o be sent out to make a cross connect, that is in offices that had the cosmic frames and the line card was cross connected to a cable pair. When we GTE cut over switches we rain all the jumpers needed for active lines and most of the others, this was more of a fact in remote offices, not the base. The California company got rid of most of the frame people, if not all of them. I always thought this was an error and short sited by the company, since the switch people were busy with a lot of other things. When we built new remotes, the maintenance had the CO installers do all the cross connects since they did not have the personal or the time to do it.