My VS R3 module died. Power light doesn't come on, nothing. Dial Int-777 get slow busy.
I've got a new R5 on the way so I decided to start reading on installation. It seems the VMS Hunt Group 7 has to be set. It says I should have a Form B1 and Form B2, which I have neither of. So I dont know how the original install was set up.
Is there a way to determine which extensions to assign my new 4 Port R5 to?
I've my setup goes like this:
I've got two 5 "port" racks for the system.
Rack 1:
Slot 1 - 206E (10/11/12/13/14/15) Slot 2 - 206E (16/17/18/29/20/21) Slot 3 - System Processor / Partner II R4.1 Slot 4 - 206E (22/23/24/25/26/27) Slot 5 - 206E (28/29/30/31/32/33)
Rack 2:
Slot 1 - 206E (34/35/36/37/38/39) Slot 2 - 206E (40/41/42/43/44/45) Slot 3 - Expansion Processor Slot 4 - Partner Mail VS R5 (soon) Slot 5 - 206E (no numbers)
So would that make my PMVS5 use 46/47/48/49 and have 50 as the next open extension?
Thank you for your time,
Ryan
Please reply.