INI procedure for Option 81C

What is the correct procedure to INI a 81C? I have done this on Option

11Cs, but haven't done it on a system with redundant processors. Do you need to INI both processors and if yes, do you do them seperately or at the same time?

Thanks!

Reply to
mjamm
Loading thread data ...

Press the INIT or INI button on the active side - the one with the fewest red lights is active. 60 top 120 seconds on a 2000 to 3000 line system.

Reload/Sysload - press both sides RLD button at once is the ready fire aim method. I do it every 6 months to make sure it will work when I don't plan it. 4 to 5 minutes of down time. May be less on some systems

Reply to
GHTROUT